Reaching across the full extent of the typical project lifecycle and beyond, from pre-concept through to post completion, we can deliver turnkey services taking responsibility for the timely, quality and cost effective delivery on work packages agreed with the client, this can include detailed engineering, project management, stakeholder management, requirements analysis and specification, peripheral services to the core engagement as necessary such as IP design, spectrum procurement, reliability engineering, structural or geo-technical engineering, EME assessment for example depending on the project.
Our services and solutions are certified to:-
SAT has provided front end conceptual design and strategies to a number of client organisations, usually these include Requirement and Option analysis, Net Present Value analysis and SWOT / strategic evaluation against user requirements. This can be elaborated further into a business case which eventually turns into a detailed design with for construction drawings. This typical abbreviated classical project lifecycle can be customised to client precise requirements, terminology or process as required or alternatively use some of the SAT standard templates for documents and drawings.
SAT have ICT and Radio specialist project managers to manage projects through the project cycles to agreed timeframes, costs and quality outcomes. These specialists can be retained internally to SAT or can be placed on site with clients.
SAT has installation and testing experts with extensive experience in a broad range of ITC/Tele/Radio- communication site installation, test and commissioning as well as integration and testing services.
Our experts can perform for example ICT core network or site radio base station equipment installation ranging from full market deployments to channel adds and removals. SAT testing and commissioning experts can troubleshoot your issues on-site and resolve problems quickly.
SAT offers a full range of testing services from single channel test and acceptance to the testing of PDH, SDH IP & WiMax, TETRA, P25, 3G, LTE, and soon 5G layers and facilities across all Private and Public network architecture elements.
We have in-house expertise to complete all aspects of the installation, testing and commissioning of fibre and radio systems, including fully trained and certified technicians and riggers available on a skills hire only basis through to full turn-key project delivery.
At SAT, we pride ourselves on our ability to mobilise quickly, and deliver a quality outcome ON TIME, EVERY TIME from the ROUTINE to the EXTREME.
Please Contact our Project and Integration Services Department here
Tower Build | Type | Dates | Prime Company | Staff |
Lask Edge, MEB, Central England | New 20m lattice. My first ever tower project as the Senior Project Engineer | 1989 | MEB | Dale Stacey Cedric Nickless |
British Gas Perth, Scotland | New 20m Lattice in Scotland | 1991 | BG | Dale Stacey Mike Ingleby |
6 Oil Filed Communications Tower builds, Aksai Field , NE Kazakhstan | 6 Oil Filed Communications Tower builds, Aksai Field , NE Kazakhstan | 1992 | Agip Milan | Dale Stacey Faust Cosentino |
Dunkeld Tower, Scottish Power, Fife, Scotland | 20m tower extension to Scottish Power Tower | 1992 | BG/SG | Dale Stacey |
Shooters Hill, Oberon NSW | New 40m Lattice with Tower fire look out hut, went up in 8 weeks from Concept to completion. My first tower build in Australia | 1996 | ATI | Dale Stacey Qantum |
Top of UTS Building Sydney, New Antenna structure surround on 3 floors of plantroom, NSW | 180m above street Level | 1997 | ATI | Dale Stacey Quantum |
Peters Hill, Vic | 25m Tower upgrade and 2 Km power line | 1997 | ATI | Dale Stacey Quantum |
Waurn Ponds | 15m building extension | 1997 | ATI | Dale Stacey Ian Curry |
Mt Noorat, Warnambool, Vic | 20m spun concrete pole | 1997 | ATI | Dale Stacey Ian Curry Dave Harte |
Monash University, Gippsland, Vic | 40m new aesthetic Architectural Lattice Tower centrepiece to campus | 1997 | ATI | Dale Stacey Quantum |
Franklins Ingleburn | 30m, spun concrete pole | 1997 | ATI | Dale Stacey Paul Brand Dave Harte |
Uni of Newcastle Ourimbah, NSW | 30m spun concrete Pole | 1998 | ATI | Dale Stacey Paul Brand Dave Harte |
Designed and Installed Tower 600 Bourke Place, Melbourne, Vic | 240m+ above Melbourne streets | 1998 | ATI | Dale Stacey Ian Curry Dave Harte |
Dicks Banks, Launceston, Tas | New 25m spun concrete pole | 1999 | ATI | Dale Stacey Ian Curry Dave Harte |
Griffith University, Gold Coast Campus | New 25m Spun Concrete Pole | 1999 | ATI | Dale Stacey Steve Barlow |
Quoin Mountain, Hobart, Tas | New 40m guyed mast | 1999 | ATI | Dale Stacey Ian Curry Dave Harte |
Olinda Grove, Hobart, Tas | New 25m spun concrete pole | 1999 | ATI | Dale Stacey Ian Curry Dave Harte |
Abels Hill, Tas, | 25m Spun concrete Pole | 1999 | ATI | Dale Stacey Ian Curry Dave Harte |
Murdoch Univeristy, Perth | New Spun concrete Pole | 1998 | ATI | Dale Stacey Paul Brand Mark Hammett |
Vincents Hill, UoT, Central Tasmania | 25m Spun concrete Pole | 1999 | ATI | Dale Stacey Ian Curry Dave Harte |
Tallowa Dam Lookout, Shoalhaven, NSW | dropped in by Helicopter. 200m above Lake, structure 3-4m high | 2012 | SAT | Dale Stacey Endy Beh Dave Harte |
New site Fossickers Flat South, Shoalhaven, NSW | platform 200m up cliff wall dropped in by Helicopter | 2012 | SAT | Dale Stacey Endy Beh Dave Harte |
Throsby Point, new Tower, , Shoalhaven, NSW | 7m see saw | 2012 | SAT | Dale Stacey Ian Curry Dave Harte |
Crown Castle Arncliffe, NSW | Design and fabrication 25m Tower replacement | 2013 | SAT | Dale Stacey Ian Curry Clay Rix |
Hornsby Heights, Spun concrete Pole jacket reinforcement | 30m steel Pole jacket reinforcement | 2013 | SAT | Dale Stacey Ian Curry Clay Rix |
Ingleburn, Spun concrete Pole jacket reinforcement | 30m | 2015 | SAT | Dale Stacey Ian Curry Clay Rix |
Mt Bertha | 30m Spun concrete Pole Biloela, Central Queensland | 2018 | SAT | Dale Stacey Ian Curry John Austen |