TurnKey Projects

End - End

Reaching across the full extent of the typical project lifecycle and beyond, from pre-concept through to post completion, we can deliver turnkey services taking responsibility for the timely, quality and cost effective delivery on work packages agreed with the client, this can include detailed engineering, project management, stakeholder management, requirements analysis and specification, peripheral services to the core engagement as necessary such as IP design, spectrum procurement, reliability engineering, structural or geo-technical engineering, EME assessment for example depending on the project.

Process Certification

Our services and solutions are certified to:-

  • Quality Systems ISO 9001,
  • Environmental ISO 14001,
  • NSW Government Occupational Health and Safety Guidelines Edition 5 and we are currently upgrading this to AS 4801/ISO 45001 certified planned for December 2018.

Concept, Strategy, Planning, Design

SAT has provided front end conceptual design and strategies to a number of client organisations, usually these include Requirement and Option analysis, Net Present Value analysis and SWOT / strategic evaluation against user requirements. This can be elaborated further into a business case which eventually turns into a detailed design with for construction drawings. This typical abbreviated classical project lifecycle can be customised to client precise requirements, terminology or process as required or alternatively use some of the SAT standard templates for documents and drawings.

Project Management

SAT have ICT and Radio specialist project managers to manage projects through the project cycles to agreed timeframes, costs and quality outcomes. These specialists can be retained internally to SAT or can be placed on site with clients.

Design and Construct, Installation Test & Commissioning

SAT has installation and testing experts with extensive experience in a broad range of ITC/Tele/Radio- communication site installation, test and commissioning as well as integration and testing services.

Our experts can perform for example ICT core network or site radio base station equipment installation ranging from full market deployments to channel adds and removals. SAT testing and commissioning experts can troubleshoot your issues on-site and resolve problems quickly.

SAT offers a full range of testing services from single channel test and acceptance to the testing of PDH, SDH IP & WiMax, TETRA, P25, 3G, LTE, and soon 5G layers and facilities across all Private and Public network architecture elements.

We have in-house expertise to complete all aspects of the installation, testing and commissioning of fibre and radio systems, including fully trained and certified technicians and riggers available on a skills hire only basis through to full turn-key project delivery.

At SAT, we pride ourselves on our ability to mobilise quickly, and deliver a quality outcome ON TIME, EVERY TIME from the ROUTINE to the EXTREME.

Please Contact our Project and Integration Services Department here

Tower Build Type Dates Prime Company Staff
Lask Edge, MEB, Central England New 20m lattice. My first ever tower project as the Senior Project Engineer 1989 MEB

Dale Stacey

Cedric Nickless
British Gas Perth, Scotland New 20m Lattice in Scotland 1991 BG

Dale Stacey

Mike Ingleby
6 Oil Filed Communications Tower builds, Aksai Field , NE Kazakhstan 6 Oil Filed Communications Tower builds, Aksai Field , NE Kazakhstan 1992 Agip Milan

Dale Stacey

Faust Cosentino
Dunkeld Tower, Scottish Power, Fife, Scotland 20m tower extension to Scottish Power Tower 1992 BG/SG Dale Stacey
Shooters Hill, Oberon NSW New 40m Lattice with Tower fire look out hut, went up in 8 weeks from Concept to completion. My first tower build in Australia 1996 ATI

Dale Stacey

Qantum
Top of UTS Building Sydney, New Antenna structure surround on 3 floors of plantroom, NSW 180m above street Level 1997 ATI

Dale Stacey

Quantum

Peters Hill, Vic 25m Tower upgrade and 2 Km power line 1997  ATI

Dale Stacey

Quantum 
Waurn Ponds 15m building extension 1997 ATI

Dale Stacey

Ian Curry
Mt Noorat, Warnambool, Vic 20m spun concrete pole 1997 ATI

Dale Stacey

Ian Curry

Dave Harte
Monash University, Gippsland, Vic 40m new aesthetic Architectural Lattice Tower centrepiece to campus 1997 ATI

Dale Stacey

Quantum
Franklins Ingleburn 30m, spun concrete pole 1997 ATI

Dale Stacey

Paul Brand

Dave Harte
Uni of Newcastle Ourimbah, NSW 30m spun concrete Pole 1998 ATI

Dale Stacey

Paul Brand

Dave Harte
Designed and Installed Tower 600 Bourke Place, Melbourne, Vic 240m+ above Melbourne streets 1998 ATI

Dale Stacey

Ian Curry

Dave Harte
Dicks Banks, Launceston, Tas New 25m spun concrete pole 1999 ATI

Dale Stacey

Ian Curry

Dave Harte
Griffith University, Gold Coast Campus New 25m Spun Concrete Pole 1999 ATI

Dale Stacey

Steve Barlow
Quoin Mountain, Hobart, Tas New 40m guyed mast 1999 ATI

Dale Stacey

Ian Curry

Dave Harte
Olinda Grove, Hobart, Tas New 25m spun concrete pole 1999 ATI

Dale Stacey

Ian Curry

Dave Harte
Abels Hill, Tas, 25m Spun concrete Pole 1999 ATI

Dale Stacey

Ian Curry

Dave Harte
Murdoch Univeristy, Perth New Spun concrete Pole 1998 ATI

Dale Stacey

Paul Brand

Mark Hammett
Vincents Hill, UoT, Central Tasmania 25m Spun concrete Pole 1999 ATI

Dale Stacey

Ian Curry

Dave Harte
Tallowa Dam Lookout, Shoalhaven, NSW dropped in by Helicopter. 200m above Lake, structure 3-4m high 2012 SAT

Dale Stacey

Endy Beh

Dave Harte
New site Fossickers Flat South, Shoalhaven, NSW platform 200m up cliff wall dropped in by Helicopter 2012 SAT

Dale Stacey

Endy Beh

Dave Harte
Throsby Point, new Tower, , Shoalhaven, NSW 7m see saw 2012 SAT

Dale Stacey

Ian Curry

Dave Harte
Crown Castle Arncliffe, NSW Design and fabrication 25m Tower replacement 2013 SAT

Dale Stacey

Ian Curry

Clay Rix

Hornsby Heights, Spun concrete Pole jacket reinforcement 30m steel Pole jacket reinforcement 2013 SAT

Dale Stacey

Ian Curry

Clay Rix
Ingleburn, Spun concrete Pole jacket reinforcement 30m 2015 SAT

Dale Stacey

Ian Curry

Clay Rix
Mt Bertha 30m Spun concrete Pole Biloela, Central Queensland 2018 SAT

Dale Stacey

Ian Curry

John Austen